G T Rochester Plant Ltd, Marine, Civil and Ground Works, Norfolk

Recent Projects

Here's a showcase of older projects. Click to enlarge any of the thumbnail images and use your arrow keys to navigate through the images.

Our Hitachi EX60 Rubber Tracked Mini Crawler Crane carrying out fender work in a timber drydock

Our Hitachi EX60 Rubber Tracked Mini Crawler Crane carrying out fender work in a timber drydock

Regenerated urban parkland Lake inclusive of dredging 5000m3 of silt install 750m of plastic piles & reconstruction public hard standing

Regenerated urban parkland Lake inclusive of dredging 5000m3 of silt install 750m of plastic piles & reconstruction public hard standing

Installing 750m of plastic piles to regenerate an urban parkland lake

Installing 750m of plastic piles to regenerate an urban parkland lake

Installing a new dry-dock inside a building using a 360o excavator side grip installing sheet piles

Installing a new dry-dock inside a building using a 360o excavator side grip installing sheet piles

Installing new dry-dock cofferdam dug out and base concreted

Installing new dry-dock cofferdam dug out and base concreted

Finished dry-dock

Finished dry-dock

Installing new mini piles to failing foundations of a thatched 3 bedroom boat house

Installing new mini piles to failing foundations of a thatched 3 bedroom boat house

Installing basement to a 5 storey water tower

Installing basement to a 5 storey water tower

>Installing 12no 15m bearing piles to the base of failing timber drydock

Installing 12no 15m bearing piles to the base of failing timber drydock

Installing basement to 5 storey water tower inclusive of underpinning tower to a depth of 3m below ground level and installing shuttering to multiple angles

Installing basement to 5 storey water tower inclusive of underpinning tower to a depth of 3m below ground level and installing shuttering to multiple angles

 

 

 

Installation of parallel strip foundations on 1:9 slope to accommodate hooped 9m high rubb building

Installation of parallel strip foundations on 1:9 slope to accommodate hooped 9m high rubb building.

Installation of a tie back waling after installation of new piled quay wall LX16 12m Long

Installation of a tie back waling after installation of new piled quay wall LX16 12m Long.

Removal of existing sheet and timber piled walls exposing new piled quay wall

Removal of existing sheet and timber piled walls exposing new piled quay wall
(pictured left).

Afloat dredging then installing mooring piles and floating jetties

Afloat dredging then installing mooring piles and floating jetties.

Our 35 ton NCK C40 Pennine crane - available for contracts and hire

Our 35 ton NCK C40 Pennine crane - available for contracts and hire.

Emergency shoring to a failing live bridge deck using confined space specialists prior to strengthening by mass pouring the bridge void with concrete

Emergency shoring to a failing live bridge deck using confined space specialists prior to strengthening by mass pouring the bridge void with concrete.

Installation of 2no 5.5m deep pumping stations by launching a 3.5m wide caissons then sinking by removal of the centre and controlled mining of the edges

Installation of 2no 5.5m deep pumping stations by launching a 3.5m wide caissons then sinking by removal of the centre and controlled mining of the edges.

Installation of  foundations and 12.5m x 46m x 200mm reinforced concrete slab with related ground works for industrial units.

Installation of foundations and 12.5m x 46m x 200mm reinforced concrete slab with related ground works for industrial units.

Installation of RC concrete slab for 2 new offices and public toilets inclusive of all ground works 230t muck away and 116m3 of concrete through a restricted width access off a major market town’s market place

Installation of RC concrete slab for 2 new offices and public toilets inclusive of all ground works 230t muck away and 116m3 of concrete through a restricted width access off a major market town’s market place.

Installation of timber column, framed 2 storey offices and public toilets (on site pictured left) using our 4.7ton Crawler crane

Installation of timber column, framed 2 storey offices and public toilets (on site pictured left) using our 4.7ton Crawler crane.

Fully installed marina, inclusive of demolition & removal of sunken 140ft timber fishing vessel as well as other substantial keels Dredging 2000m of silt with a crane barge and the dredger admiral day installation of mooring piles & pontoons

Fully installed marina, inclusive of demolition & removal of sunken 140ft timber fishing vessel as well as other substantial keels. Dredging 2000m of silt with a crane barge and the dredger admiral day installation of mooring piles & pontoons

Oversite reduction - inclusive of removal of 80 tons of sand and installation of 1m wide x 2.5m high x 26m long retaing wall by installing a flint filled Gabion Basket Wall

Oversite reduction - inclusive of removal of 80 tons of sand and installation of 1m wide x 2.5m high x 26m long retaing wall by installing a flint filled Gabion Basket Wall.

Concrete repair to capping beam damage caused by ship collision

Concrete repair to capping beam damage caused by ship collision

Installation of a timber quay heading with low and high tie back system and Import 180 tons of backfill

Installation of a timber quay heading with low and high tie back system and Import 180 tons of backfill.

Our NCK Pennine crane lifting out 2no damaged jetty trestles caused by ship collision. Works also included fabrication and installation of 2no new 12”x12” greenheart timber trestles then full deck installation

Our NCK Pennine crane lifting out 2no damaged jetty trestles caused by ship collision. Works also included fabrication and installation of 2no new 12”x12” greenheart timber trestles then full deck installation.

 

Harbour work including installation of 40m linear sheet piled wall consisting of 10m long Larsen sheet piles, dredge in front of harbour wall to depth and drive 10no timber piles for rubbing streaks

Harbour work including installation of 40m linear sheet piled wall consisting of 10m long Larsen sheet piles, dredge in front of harbour wall to depth and drive 10no timber piles for rubbing streaks.